In order to ensure a long, useful service life, it is critical that a power transformer and its ancillary components are tested regularly for incipient fault modes. In addition to the above transformer testing methods, the power transformer also goes through some other tests, performed on it, before the actual commissioning of the transformer at the site. Testing of current transformers, voltage transformers or auxiliary transformers internal to the power transformer are not included in this swp. Transformers play an important role in the power system. In the previous transformer tutorials, we have assumed that the transformer is ideal, that is one in which there are no core losses or copper losses in the transformers windings.
References appendix a contains a list of references used. Electrical power transformers definition and types the ef. Because a test confirms what you know, if you can apply in real life what you have learned in a classroom, under strict, rigorous and controlled conditions. Transformers are an electrical component that transmit electrical energy between at least two circuits. Apr 10, 2015 high vol tage testing of transformer by hari shankar singh 1. Furthermore, it is a useful test for verifying power transformer winding connections and phase displacement corresponding to its vector group on the nameplate in the. We offer a complete electrical packaged power solution we partner with our clients from project inception to commissioning and offer the full range of services encompassing all components such as design, manufacture, installation, testing and commissioning as. Firstly measure insulation resistance between low voltage windings and the main body of the transformer. The purpose of a distribution transformer is to reduce the primary voltage of the electric. Factory witness tests power transformer what tests. Im looking for opinions on what tests are most important to actually witness during factory testing of power transformers if there are time constraints id assume the dielectric tests are the most critical, but how would you rank.
When ac hipot tests are used for routine maintenance, the power transformer can be examined at rated voltage for 3 min instead of testing at 65% of factory test voltage. Scope this specification covers the design, engineering, manufacture, testing, supply, delivery, offloading and performance requirements of 3311kv power transformers for use in the. Test setup for the test, the terminal to be tested will be connected with a marks generator. In this article we define the tests that are performed on power transformers. Testing procedure a ensure that test specimen is isolated from other equipments b position the test set at least 6 feet 180 cm away from test. Which of the following is not a routine test on transformers. Common electrical tests on power transformers omicron. Transformer testing type tests and routine tests of. Mlgw began to test each of its transformers for furans in 2009.
No one can precisely answer when equipment will fail, but its essential to manage the risk. Ironcore transformers are usually used when the source frequency is low below 20 khz. The purpose of the test is to secure that the transformer insulations withstand the lightning overvoltages which may occur in service. Drytype insulated, 2bushing, linetoline voltage transformers below 15 kv, test at 2 kv and ln voltage, to the nearest 500 volts. Power transformers play an essential role in the transmission, distribution and utilization of electrical energy. Power transformer factory acceptance test checklist february 28, 2017 may 4, 2018 basicelectricaldesign why power transformer factory acceptance test checklist is required. Trafositetesting mobile highvoltage test system for onsite testing of power transformers flv english flv movie considerations for the design, manufacture, and retrofilling of power transformers with high fire point, biodegradable ester fluids english pdf technical publication.
Alok pandey assistant professor assistant professor department of electrical department of electrical engineering engineering a seminar on high voltage testing of electrical transformer presented by hari shankar singh. Technical specification for 3311kv power transformers apdrp scheme page 1 of 72 part 1. Evaluation of an efficiencent transformer core design poonam lutchman a dissertation submitted to the faculty of engineering and the built environment, university of the witwatersrand, in fulfilment of the requirements of the degree of master of science in engineering. Siemens power transformers can be integrated into any kind of power management system. Potential transformer testing ptvt valence electrical. Aug 03, 2015 test methods specification testing transformers for power supply units and isolating transformers are subject to production testing, where compliance is generally checked by inspection and electrical tests. Ac testing of drytype distribution and power transformers by. In this book we have laid down important aspects on transformer.
Abstract recognition of power transformer protection is a veryimportant task for the power system operation. Transformer pd and induced voltage withstand test system. They are often in operation for a long time and only stop working during power interruptions and maintenance. The ac hv test value should not surpass 75% of the factory test value. The testing is conducted by artificial generation oflightning impulse using impulse generators. Guide to the lightning impulse and switching impulse testing power transformers and reactors iec tcsc 14 on. Fig 1 capacitor banks are charged in parallel from a d. An analysis of transformer failures, part 1 1988 through 1997 transformers losses are significant. The book represented the collective wisdom of over 100 years of testing power transformers. Power transformers testing, electro magnetic interference. Schering bridge or transformer arm bridge, power supply and standard capacitor is used for measurement of capacitance and tan. Ensure that all equipment to be tested is properly grounded and treat all highvoltage power equipment as energized until proven otherwise by using the proper lockouttagout procedures.
Check the value after one minute and record the steady value. The following should be expected on chl power factors. Transformer testing commissioning, routine, diagnostic. This is one of the best testing techniques for predictive and preventive maintenance. Mainly two types of transformer are done by manufacturer before dispatching the transformer mainly 1 type test of transformer and 2 routine test. How do you test a power transformer that is disconnected.
There are various test required on transformer to conform performance of transformer. Insulation power factor testing of power transformers. To duplicate and to pass over to third persons without previous permission is forbidden. Testing of power transformers seems like a similar experience.
Build your own current limiter for protection when repairing and testing electronic equipment duration. The priciples of routine, type and special tests are however similar and thus this booklet is applicable for testing of. Transformer condition assessment services from doble power provide a solid foundation for effective maintenance programs based on industry best practices. Insulation resistance test of transformer is divided into three parts. Most of abbs power transformers are available with core or shelltype technology. The preference is that all large power transformers 1 mva be tested with ttr test set. Power transformers is our clients goto contractor when it comes to the design of cutting edge, turnkey electrical systems.
It is carried out as a type test as well as routine test. Practical experience on transformer insulation condition. The measuring equipment differens from those explained herein. Ptb testing instructions, volume 12, instrument transformers, 1977, with amendments 579 individual testing one by one successive testing charge. Iwanusiw, consultant eltel industries, bangalore, india resume this paper discusses the dissipation factor measurements that can be carried out. Tm 5686 power transformer maintenance and acceptance testing. Electrical transformer manufacturer power transformers. Open circuit loose connection of winding 8 magnetic current test test purpose. Measurements and correction of noload losses of power. The pt power transformer waveform is first decomposed by. Testing of power transformers transformer electrical. The authors would like to thank several members of the repair and onsite testing team of abb brazil, power transformer division, whose dedication and competence have contributed to the development of technology and made highquality onsite testing of large hv power transformers possible. Insulation power factor testing of power transformers oleh w. The ironcore transformer provides better power transfer than does.
Zeras testing systems can be designed for testing instrument transformer manuell or automatic. Diagnostic testing and monitoring of power transformers. Before conducting a transformer winding resistance test, it is important to observe all safety warnings and take proper precautions. Jun 17, 2016 testing power factor is a means of measuring the integrity of electrical insulation, since the smaller the power factor, the better the insulator. On virtual or instrumentation, record the primary input power to the transformer in table 51. Multifunctional test set for a comprehensive condition diagnosis and condition assessment of multiple highvoltage assets. Hv earth isolate the power supply to the transformer connect the hv live part of the terminal to the earth by connecting with. These activities will increase the transformerss service lie and help to make the transformers operation both safe and troublefree. This gives you insight into the current operating condition of the transformer and critical loads, thus facilitating the prevention of power.
A current equivalent to the rated primary current is forced to flow through the transformer primary winding. White shermco industries introduction drytype transformers have more and more common, especially with their use at wind farm sites. Power dissipation factor and capacitance test set, including source and reference capacitor for various highvoltage assets. For those categories of power transformers and reactors which have their own indian standards, this part is. Power transformer testing procedures and schemes photo credit. Transformer testing has developed considerably over the past years. Ch and cl power factor or dissipationfactor values will vary due to support insulators and bus work utilized on dry transformers.
In 2003, abb compiled all its knowledge in a book titled testing of power transformers. At this condition we measure the secondary current. Measurements and correction of noload losses of power transformers article in ieee transactions on instrumentation and measurement 542. Contact abb or refer to abb product notes for detailed descriptions of our range. Back to the basics potential transformer testing ptvt as test equipment becomes more sophisticated with better features and accuracy, we risk turning our field personnel into test set operators instead of skilled field service technicians. Test procedures and equipment used for the testing of large power transformers at abb oy, power transformer, vaasa works are dealt with in the following sections. It has been written for transformer designers, test field engineers, inspectors, consultants,academics and. Field testing of a power transformer before putting into service 50mva.
The results of the test series show how the breakdown voltage varies with the distance between the electrodes. And we will start by highlighting two indices that are the basic factors for judging the conditions of the transformer insulation. This amounts to a rigorous examination of the transformer intended to. Power transformers transformers siemens global website.
A deformation has been provoked in the test transformer winding with the aim of testing the models ability to detect it. Power transformer testing procedures and schemes eep. Power transformers are defined as transformers rated 500 kva and larger in figure 1 is shown typical power transformer. When iec standards do not exist for such categories of transformers, this part of iec 60076 may still be applicable either as a whole or in part. Noise level test in a transformer is a a special test b routine test c type test d none of the above ans.
The purpose of the switching impulse test as special test is to secure that the insulations between windings, between windings and earth, between line terminals and earth and between different. A power transformer must withstand tremendous loads during a lifetime of up to 40 years. One must assure that the test cell is clean and it is a wise precaution to bleed the sampling tube to assure a representative sample. Testing will commence only after the equipment is completely installed as per approved method statement for the installation of the transformer and released for testing commissioning. A primary part of commissioning a transformer involves testing it after its installation in the field. In addition some other tests are also carried out by the consumer at site before commissioning and also periodically. Diagnostic measurements for power transformers mdpi.
In this paper, faults in power transformers are categorized into two internal and external faults. For those categories of power transformers and reactors which have their own iec standards. Some of these techniques are conventional and generally analytical. A 40yearold transformer showed a degree of polymerization of 260 in early 2010 during testing, with estimated remaining life at 19 percent. Stationary and mobile transformer transformer testing.
The electrical tests establish earth continuity for class i, noload output voltage, dielectric strength between live parts of the input circuit and accessible conducting parts of the. Measure the primary current and the secondary voltage, and record the results in table 51. Transformer winding resistance measurement is carried out to calculate the i 2 r losses and to calculate winding temperature at the end of a temperature rise test. It operates mainly during high or peak loads and has a maximum efficiency at or near full load.
The methods used during tests and measurements of the power transformers, test and measurement circuits, calculations and evaluation criterias are included in this manual. Power transformer factory test using ieee standards. This requires quality down to the smallest detail and carefully selected components. In fact, the use of aggressive asset management strategies is changing the way we view the expected lifespan of large electrical power apparatus, especially transformers. Power transformer factory acceptance test checklist basic. Page 1 of 14 standard work practice sp0504 ver 4 ergon energy corporation limited abn 50 087 646 062 ergon energy queensland pty ltd abn 11 121 177 802 1. Consult transformer manufacturers or test equipment. This document applies primarily to the maintenance and diagnostics of oilfilled power. Recognition of power transformer faults using wavelet based.
The tests this laboratory is able to carry out are the following. It is also done at site to ensure healthiness of a transformer that is to check loose connections, broken strands of conductor, high contact resistance in tap changers, high. A softironcore transformer is useful when the transformer must be physically small, yet efficient. As an object class, transformers have consistently been ranked in the top five objects for claims paid by hartford steam boiler during the past several decades.
In this work, a hybrid of wavelet transform and neural network wnn approach is introduced for ptp power transformer protection events classification. Emi diagnostics is a noninvasive, online electromagnetic interference survey which provides a broader system view of defects, including partial discharge, and can detect a wide variety of electrical and mechanical system component problems in generators, motors, isolated phase bus, transformers, cables, switchgear and associated electrical system components. Depending on the transformer type there are different strategies possible for cabling and grounding. With a proper condition assessment and maintenance program, power transformers can continue to provide reliable service far beyond the average transformer life expectancy.
You can opt to integrate them into any cloudbased monitoring system, such as mindsphere. Power transformer testing swp check this is the latest process zone version before use. On smaller drytype transformers, such as the one shown in figure 1, not a lot of time and money is spent on their testing and maintenance. If you do not have any voltage at the heater winding of the power transformer when it is in the circuit but it measured ok when it was out of the circuit, something is loading and pulling down the voltage. All materials and relevant documentation to this testing works shall be checked by the responsible personnel prior to the commencement of testing. For testing the diffrential schemewe apply a reduced voltage of 480v on the transformer primary. For this purpose, power transformers are widely used in the industry. Switch on the power supply unit and using the output voltage dial, set the phase voltage to 200 v as shown on the virtual or conventional voltmeter e 1. Gray transformer chemistry services introduction the fault free operation of power transformers is a factor of major economic importance and safety in power supply utilities and industrial consumers of electricity. Depending on phasing connection, this phase shift may be either plus or minus 30 degree from primary to secondary for positive sequence voltages and currents. Where indian standards do not exist for such categories of transformers, this part of is 2026 may still be applicable either as a whole or in part.
Power transformer transformers transfer electrical energy. C electrical power from one voltage to another voltage keeping the frequency same by electromagnetic induction discover the worlds research 16. Separate source voltagewithstand test induced over voltage withstand test partial discharges measurements. New power transformer inspections and tests instant video. Transformer tests eep electrical engineering portal. Oil tests in the shop or laboratory would be carried out at room temperature 20o c. The transformer was immediately taken offline and internally inspected to identify any problems. Over the years, hsb has investigated thousands of transformer losses. However, in real world transformers there will always be losses associated with the transformers loading as the transformer is put onload. If that voltage is ok, look for an open between the transformer and the heater pins on the first tube. Linetoneutral ln voltage is system voltage divided by 1. Transformers typically used because a change in voltage is needed. Regularly performing a range of standard electrical tests has proven an effective way to gain a reliable insight into the operating condition of your transformers and can extend their lifespan.
236 105 71 456 1188 1615 1142 790 858 882 938 919 1327 640 765 64 1563 290 459 406 1605 363 507 870 496 203 1143 774 450 13 693 238 591 523 688 160 1399